Home |  Support |  Installation of a waterbed | 

G. The insulation pad (Isopad)

Roll out the insulation pad and spread it out on top of the base board with the printed side faced up.23

23. Roll out the insulation pad and spread it out on top of the baseboard with the printed side upwards. Make sure all the sticky tape and remnants are removed.

Position the Isopad neatly in the centre24

24. Position the Isopad neatly in the centre.